Link stage-lighting, LED-screen or audio equipment through the specified blue-to-gray three-pin locking power connection. This 1.8 m cord, shown as 5.91 ft, is a power-link assembly whose mating ends and device roles need to be selected together.
Identify the locking profiles at both devices
Provide the inlet and outlet drawings for the equipment being connected. Match the connector shape, keying and pin assignments to those devices; colour names alone do not settle the physical mating arrangement.
Select the area with the actual connector version
The blue and grey version is offered alongside a separate option labelled tuer 1. Identify the drawing for that second option before selecting it, and retain the required cross section with the chosen version.
- The stated reach is 1.8 m, or 5.91 ft.
- PVC identifies the supplied material description.
- A 10 A current designation is given.
- Cross-section choices are 0.75, 1.0, 1.5 and 2.5 mm².
- Blue and grey and tuer 1 remain separate version choices.
Choose a cable family for the finished assembly
SJT, SJTO, SJTW and SVT appear as family references. Specify which construction is required with the selected area and locking ends, and confirm the complete electrical rating for that build.
Define the event-equipment routing conditions
Include the installation voltage, route and exposure requirements with the request. If a NEMA supply connection is required, confirm that exact arrangement on the assembly drawing. This keeps a locking equipment-to-equipment link and any alternative supply-ended request clearly specified for the event setup.