Series illustrations. Actual configuration is subject to the confirmed drawing.

9-Pin Male-to-Male E-Bike Hub-Motor Extension, Bare Copper PVC 3+6-Core 1.5m IP65

Share
  • Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.

Product description
Quotation & delivery
  • Nominal size
    Multiple mm² options
    Insulation material
    PVC
  • Conductor material
    Bare copper
  • Conductor Material
    Bare Copper
    Connector Type
    9 Pin
  • Insulation Material
    PVC
    Length
    1.5 m(4.92ft)
  • Rated Voltage
    12V, 110 V, 240 V
  • Application
    Machines, Electronic, Power, Other
    IP Level
    IP65
  • Jacket Material
    PVC
    Size
    3*1.5mm2+6*1.0mm2
  • Flex Life
    ≥1000000
    Product Name
    9 pin Motor Head male to male Extension 3+6 Core Cable
  • Connector
    9 pin plug connector
    Cable length
    1.5M
  • Rate
    300V 15A+5A
    Cable
    1.5mm2/3C+1.0mm2/6C
  • conductor
    Copper
    Color
    Black
  • MOQ
    500pcs

This nine-pin male-to-male e-bike back-hub motor extension has bare-copper conductors with PVC insulation and a PVC jacket. The construction reference is 3×1.5mm² plus 6×1.0mm², with a 1.5m physical length and IP65 specification. Its actual selection is black, nine-core and 9P, keeping the known wire and end identity together for the selected motor connection.

Match all nine pins to the motor arrangement

Show both male ends and their exact mating arrangement on the complete equipment drawing. Define each required pin function and polarity with the motor connection, retaining the nine-core construction beside that layout. Include the end preparation and installation information applicable to the selected wire and connector combination.

Retain the two conductor-area groups

Keep the three 1.5mm² and six 1.0mm² conductors explicit on the wire drawing. Match their required functions to the approved pin schedule rather than selecting from the overall core count alone. Retain bare copper, PVC insulation and the PVC jacket with that full construction and equipment arrangement.

Resolve the voltage and current-reference roles

The electrical references include 12V, 110V, 240V and 300V, plus 15A+5A. Confirm which part and operating scope each value describes for the chosen extension. Define the actual current mapping and motor duty with the selected wire/pin configuration, keeping those requirements on the same approved drawing.

Complete the physical and flex-life scope

Confirm the unit and conditions of the ≥1000000 flex-life reference. Retain those conditions with the IP65 installation requirements, black 1.5m physical request and quantity, completing the schedule with the full pin and electrical arrangement.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.