Series illustrations. Actual configuration is subject to the confirmed drawing.

BTLY 5-Core Flexible Copper Mineral-Insulated Aluminum-Sheathed Fire-Resistant Industrial Power Cable 0.6/1kV

Share
  • When You'll Get It:Nov 26 - Nov 30

  • Shipping & Support: In-stock items ship in 24 hours; custom orders ship per contract. Free shipping on orders over $10,000. For bulk buys, get a personal support rep and quick reimbursement if anything's defective.

Product description
Shipping & Return
  • Conductor Material
    Copper
    Insulation Material
    Mineral
  • Rated Voltage
    0.6/1kV
    Size
    None
  • Type
    Multi-Core Power Cable

The five-core BTLY industrial cable combines copper conductors, mineral insulation and an aluminum sheath. It is specified as flexible and fire resistant, with a voltage rating of 0.6/1kV. Those construction details provide a definite starting point for matching the cable to an industrial project's circuit and connection requirements.

Define the five-core configuration through the industrial drawing

Give each conductor an electrical function, required section and equipment connection in the project design. Retain the five-core designation beside this allocation. The completed drawing should let the cable-end reviewer identify which conductor serves each connection and what termination details are needed. Include the final allocation in the cable schedule used to describe the order.

Use the explicit aluminum sheath when comparing constructions

The sheath metal and conductor metal are different material requirements in this build. Keep aluminum sheath, copper conductors and mineral insulation separately identified when reviewing alternatives. Use a construction drawing that describes all of those layers to assess end preparation and compatible terminations. This gives the industrial connection design a material reference specific to the cable being selected.

Coordinate the flexible route and project acceptance conditions

Review the applicable bending and handling details with the intended installation route and access around the equipment. Account for the space needed to prepare the sheath and complete both cable ends. If the industrial specification requires an IEC method or exact fire-performance qualification, name the acceptance conditions and assess the selected construction evidence for that installation.

Make conductor size and physical length separate order items

Confirm each conductor section using the approved five-core schedule. State the required cable cut length independently, and retain the aluminum-sheathed build and agreed termination requirements with the order description. The final construction reference should accompany the project's specified fire criterion.

Shipping cost is based on weight. Just add products to your cart and use the Shipping Calculator to see the shipping price.We want you to be 100% satisfied with your purchase. Items can be returned or exchanged within 30 days of delivery.