Series illustrations. Actual configuration is subject to the confirmed drawing.

European Two-Pin Plug to IEC C7 Figure-Eight Power Cord Request, 1.5m Two-Core 250V Selected-Construction Cable for TV Speaker Printer Projector Small Appliance

Share
  • Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.

Product description
Quotation & delivery
  • Nominal size
    0.5 mm²
    Rated voltage
    250 V
  • Insulation material
    PVC
    Conductor material
    Aluminium
  • Conductor Material
    Aluminum
    Insulation Material
    PVC
  • Rated Voltage
    250 V
    Size
    1*0.5 mm²
  • Application
    Overhead
  • IP Level
    IP44
    Jacket
    PVC
  • Rated Current
    16 A, 30 A
    Type
    Medium Voltage
  • Working Temperature
    70°C, 90°C

The featured European figure-eight equipment-lead request pairs a two-pin source with an IEC C7 receiving interface. Its actual 1.5m, approximately 4.92ft, two-core version has a 250V configuration for a TV, speaker, printer, projector or small-appliance connection.

Define the actual conductor construction

Confirm the actual aluminum/PVC wire requirement for the selected lead. Agree conductor arrangement and dimensions for the 1 × 0.5mm² size reference.

Keep the actual two-core configuration and chosen construction in the assembly drawing. Both mating ends and the cable should describe the same physical build.

Set complete electrical and temperature scope

Agree the selected complete 16A or 30A requirement with the actual wire and connection ends. Match the full voltage/current rating to the source and connected-equipment demand.

Confirm how the 70°C or 90°C working-temperature requirement applies to that selected assembly. Keep the actual installation environment with the complete cable specification.

Match the equipment route and application

Measure the 1.5m route around the actual source and receiving positions. Include both connector bodies and the receiving-inlet geometry in that physical path.

Agree applicable overhead/medium-voltage or IP44 scope if requested for the selected equipment connection. Retain the actual construction, rating and intended installation with that requirement.

The final EU C7 brief should settle conductor arrangement, precise dimensions, full rating, temperature, mates and application scope. These selections define one requested figure-eight assembly around the actual receiving equipment and operating demand.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.

Related Products