Series illustrations. Actual configuration is subject to the confirmed drawing.
RVVP 2-Core 300/300V Copper PVC-Insulated PVC-Sheathed Screened Control Cable −10–70°C
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
Insulation materialPVCConductor materialCopper
-
Conductor MaterialCopperInsulation MaterialPVC
-
JacketPVCWorking Temperature-10℃~70℃
RVVP two-core copper screened control cable uses PVC insulation and a PVC sheath at 300/300V. Its working range is −10 to 70°C. Define the actual conductor and shielding construction required for the equipment control interface and the route it must serve.
What does the twin-core conductor and shield drawing need to identify?
Give conductor-size units, core roles and the required conductor/strand construction. Specify finished layer dimensions and overall cable geometry. Include shield construction/material, termination and equipment terminals in that twin-core drawing.
- Assign each conductor to its actual circuit terminal.
- Identify the required shield connection for that interface.
- Associate finished cable dimensions with the installation route.
Describe the actual control circuit and installation requirements
State interface voltage and circuit load with the complete thermal requirement. Give route and exposure, including any movement requirements. Review conductor dimensions, shielding connection and terminal fit against those actual equipment conditions.
For the twin-core screened link, identify the construction evidence needed for the actual electrical, thermal and shielding requirements. Supply the chosen conductor and shield-material drawing with its contact allocation. Associate the requested scope with the installation route and finished connection lengths.
Send the selected twin-core construction with its finished lengths
Give the reviewed conductor, shield and terminal drawing with required cable lengths and quantity. Identify each finished equipment connection for the intended installation. Retain actual circuit and route requirements with the supply request so the selected screened construction is explicit.






Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.