Series illustrations. Actual configuration is subject to the confirmed drawing.
VV22 4-Core 50mm2 Copper PVC-Insulated Steel Tape Armoured STA Multi-Core Power Cable 0.6/1kV IEC Reference
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
Rated voltage0.6/1 kVInsulation materialPVC
-
Conductor materialCopper
-
Conductor MaterialCopperInsulation MaterialPVC
-
Rated Voltage0.6/1kVSizeNone
-
TypeMulti-Core Power Cable
VV22 combines copper conductors, PVC insulation and steel-tape armour at 0.6/1kV in the four-core 50mm2 configuration. Retain that material and conductor arrangement with the circuit design, including any precise IEC request when agreeing the complete outer build. Finalize compatible cable ends and physical quantities using the intended equipment connections and selected construction for the route.
Specify the required IEC number and scope
Give the exact standard number, applicable part and required supporting scope wherever the project specifies IEC acceptance. Review matching documents for the selected cable construction. Keep the precise criterion beside the material and circuit drawings when the proposed build and corresponding evidence requirements are considered together during the technical review.
Complete the selected copper and steel-tape layers
Retain copper conductor material, PVC insulation and steel-tape armour on the full construction drawing. Agree the final outer sheath to describe the finished cable. Obtain preparation information for the chosen build and retain its complete layer description when compatible cable ends and installation requirements are compared with the intended route.
Give each conductor a defined connection
State every conductor's required section, electrical duty and equipment connection on the circuit design. Keep the individual allocation with the four-core 50mm2 selection. Choose ends compatible with the approved arrangement and complete construction, checking preparation space and access at both equipment connections before physical end allowances are agreed.
Finish the physical cable schedule
Obtain installation information applicable to the selected construction and route. List physical cut lengths and the number of required cuts separately from conductor-area notation, including agreed allowances. Complete the schedule with the final sheath, approved allocation, compatible ends and precise acceptance request for the chosen STA power cable.






Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.