Series illustrations. Actual configuration is subject to the confirmed drawing.
ZR-YJV 4-Core 50mm2 Copper XLPE-Insulated Flame-Retardant Non-Armoured Multi-Core Power Cable 0.6/1kV
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
Rated voltage0.6/1 kVInsulation materialXLPE
-
Conductor materialCopper
-
Conductor MaterialCopperInsulation MaterialXLPE
-
Rated Voltage0.6/1kVSizeNone
-
TypeMulti-Core Power Cable
This ZR-YJV copper power cable combines XLPE insulation with flame-retardant non-armoured construction at 0.6/1kV in the four-core 50mm2 configuration. Review the required flame-performance criterion together with the individual conductor arrangement and full material drawing. Finalize compatible ends and physical quantities using the circuit requirements, selected outer build and intended installation route.
Define the required flame-performance criterion
Flame retardance forms part of this cable's construction. Where a particular class or method is required, specify the criterion precisely and request supporting information for the selected build. Keep the exact requirement available with the material and circuit drawings during the proposed cable and acceptance review.
Complete the non-armoured copper and XLPE layers
Retain copper conductor material, XLPE insulation and non-armoured construction together on the full drawing. Agree the final outer sheath to define the finished build. Obtain preparation information for that chosen cable and use the complete layer reference when compatible ends and installation requirements are compared with the intended route.
Allocate each conductor to its equipment connection
Give every conductor a required section, electrical duty and connection point using the circuit design. Keep the individual allocation beside the four-core 50mm2 configuration. Choose ends compatible with the approved arrangement and full construction, reviewing the access and preparation space available at both equipment connections before physical end allowances are agreed.
Complete the physical cable request
Obtain installation information applicable to the selected build and route. State physical cut lengths and quantities in a length unit, independently of conductor area, including agreed allowances. Complete the schedule with the final sheath, approved allocation, compatible ends and precise acceptance request for the required flame-retardant power cable.






Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.