Series illustrations. Actual configuration is subject to the confirmed drawing.
Black US NEMA 5-15P Male to 5-15R Female GFCI Extension Cord with Reset, SJTW PVC 1m 2m 15A 125V Workshop Construction Selected Heavy-Duty-Use Request
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
End connectionNEMA AC connection
-
AC Outlets Quantity1 OutletsCable Length1m
-
End TypeNEMA 5-15RRated Current15 A
-
TypeAc Power Cord
-
ApplicationHome Appliance, Industrial EquipmentFemale End TypeNema
-
IP LevelIP11Male End TypeNema
-
MaterialPVCWire TypeSJTW
The black US workshop-extension request connects a NEMA 5-15P male plug and 5-15R female socket with GFCI and Reset. Actual 1m or 2m SJTW/PVC versions carry a 15A, 125V designation for the selected workshop or construction connection.
Define the actual workshop requirement
Agree the receiving-equipment and connected-load requirements for the intended construction or workshop setup. Retain the actual heavy-duty-use request with that particular assembly.
Confirm any applicable approval or protection requirement for the installation. Keep those requirements attached to the actual equipment route and operating conditions.
Match the GFCI assembly and wiring
Compare the actual male source and female receiving form with their mates. Confirm the GFCI module dimensions around those connection positions.
Retain Reset with the selected physical module arrangement. Agree the conductor and wiring details for the actual SJTW/PVC lead.
Choose reach with the complete rating
Select actual 1m or 2m as the ordered route between equipment positions. Measure with the module and both NEMA connection bodies included.
Keep the full 15A, 125V requirement with the selected cable and both ends. Match that specification to the source and connected workshop or construction-equipment demand.
A workshop GFCI brief should settle mates, module, wiring, exact reach, full rating and required approval scope together. These details define the requested Reset extension around one actual installation, keeping the black SJTW/PVC construction with its receiving-equipment load and selected operating conditions.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.