Series illustrations. Actual configuration is subject to the confirmed drawing.
Black White Locking IEC C19 to C20 Three-Pin PVC Power Cord, 220V 10A Heavy-Duty-Use Server UPS Engine-Room Lead with Selected Exact Reach and Wire
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
End connectionIEC C20 , IEC C19
-
AC Outlets Quantity1 OutletsCable Length0.5 m, 1m, 1.2 m, 1.5 m, 1.8 m , 2 meters
-
End TypeC19, C20Rated Current10 A
-
TypeAc Power Cord
-
ApplicationHome ApplianceFemale End TypeIEC
-
IP LevelIP11Male End TypeCEI
-
MaterialPVCWire TypeSJT, SJTO, SJTOW, SJTW
-
Product nameC19 to C20 Power CordPlugIEC C19 with Lock
-
ConnectorIEC C20Length1m, 1.5m or can be customized
-
CableH05VV-F 3G*0.75/1.0/1.5mm2ColorBlack, White or others
-
ConductorCopper, CCA, CCSJacketPVC
-
Rating220VWarranty12 Months
A lockable IEC C19-to-C20 server-power request offers actual black or white PVC versions with US, AU, EU or UK order labels. Keep the three-pin connection and featured 5ft heavy-duty-use requirement attached to the selected server, UPS or engine-room equipment arrangement.
Match order labels to the physical lock connection
Agree actual C19/C20 genders and mates with the equipment. Define how the selected regional label maps to that complete physical assembly.
Compare the actual C19 lock interface with its receiving mate and required cable direction. Retain the lock, both connector bodies and wiring in the same ordered drawing.
Select construction around the exact route
Choose SJT, SJTO, SJTOW or SJTW, or specify H05VV-F 3G0.75mm², 3G1.0mm² or 3G1.5mm². Agree copper, CCA or CCS conductor with that particular PVC cable and wiring arrangement.
Confirm actual 5ft or requested 0.5m, 1m, 1.2m, 1.5m, 1.8m, 2m or custom reach as an exact ordered dimension. Keep black or white, or agree another finish request, with the chosen wire and lock interface.
Retain the whole 220V operating requirement
Agree complete 220V and 10A scope across the actual source, cable and receiving connection. Match the full specification to the server, UPS or appliance demand and selected wire build.
Attach any required protection conditions to that actual installation. A locking server-lead brief should settle labels, both mates, lock arrangement, conductor, exact route and full rating together, keeping the selected physical connection with the receiving equipment and its actual source-to-load requirement.






Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.