Series illustrations. Actual configuration is subject to the confirmed drawing.

BTLY Flexible Copper Mineral-Insulated Fire-Resistant Building Power Supply Cable Rated 0.6/1kV

Share
  • Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.

Product description
Quotation & delivery
  • Rated voltage
    0.6/1 kV
    Insulation material
    Mineral
  • Conductor material
    Copper
  • Conductor Material
    Copper
    Insulation Material
    Mineral
  • Rated Voltage
    0.6/1kV
    Size
    None
  • Type
    Multi-Core Power Cable

The flexible BTLY building power cable uses copper conductors and mineral insulation, with a rated voltage of 0.6/1kV and stated fire resistance. Complete the conductor arrangement against the building electrical design before finalizing the order. The resulting cable description should also identify its sheath and the connection requirements for the installation.

Establish one agreed building circuit configuration

The approved circuit drawing should give a definite core layout, the section and duty of each conductor and the corresponding equipment connection. Use that allocation to prepare the cable schedule and review the terminations. Agreement on the arrangement comes before completing conductor quantities and cable-end details. This gives the purchaser and installer a clear configuration reference for the building circuit.

Which material and routing details complete this BTLY selection?

Retain copper conductor material and mineral insulation in the construction specification. Add the sheath agreed for the actual build; the BTLY name alone is insufficient to select that layer. Review the flexible route using applicable handling and bending instructions for the chosen cable. Include access at the equipment, end preparation and compatible terminations in the review so the approved construction and intended installation are considered together.

Prepare a building order that can be checked against its drawing

After the arrangement is agreed, confirm each conductor section for the selection identified as 50mm2. Give physical cut length independently of those conductor requirements. Record the sheath, terminations and cable-end preparation with the approved construction reference. If the building specification calls for an IEC method or exact fire-performance criterion, identify the acceptance conditions and review the selected build and evidence for the required installation. Keep the circuit allocation and performance requirement with the final schedule.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.

Related Products