Series illustrations. Actual configuration is subject to the confirmed drawing.
EU IEC C19 PDU Power Cord | H05VV-F 3G*1.5mm² PVC 1m 16A Build
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
End connectionIEC C19
-
AC Outlets Quantity1 OutletsCable Length1m(3.28ft)
-
End TypeC19Rated Current16 A
-
TypeAc Power Cord
-
ApplicationHome ApplianceFemale End TypeIEC
-
IP LevelN/AMale End TypeCEE
-
MaterialPVCUSB A Output PortsN/A
-
USB Type-C PortsN/AWire TypeH05VV-F
A short PDU connection begins with the actual supply and equipment interfaces. This black European lead pairs a CEE source connection with an IEC C19 receiver, using H05VV-F cable, a selected 1.5 mm² conductor area and PVC construction over a 1 m route.
Keep the PDU connection specific
Match the CEE supply form and C19 receiver to their corresponding mating interfaces. Check connector genders, entry space and the physical route between the source and PDU or appliance before agreeing the final lead arrangement.
Retain the requested conductor build
The featured cable requirement is H05VV-F 3G*1.5mm². Retain its three-core and protective-conductor requirements while agreeing the actual conductor roles and wiring of the supplied assembly.
Area, wire family and termination details should travel together in the equipment brief. This makes the selected 1.5 mm² build clear when the receiving connection and protection requirements are reviewed.
Set the full electrical envelope
The lead carries a 16 A designation. Confirm the complete operating voltage and the scope of that current designation across the CEE source, cable and C19 receiver, then compare the resulting assembly with the actual PDU or appliance demand.
Check the one-meter installation
The stated reach is 1 m, or 3.28 ft. Measure that route with the equipment in its intended position and include mating, protective wiring, supply voltage and load details in the final specification so the short connection is chosen for the actual installation.


Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.