Series illustrations. Actual configuration is subject to the confirmed drawing.

IEC C14 to Dual C13 Y-Type Power Splitter, 0.3m H05VV-F Copper PVC 10A One-to-Two Lead for PDU UPS Computer Monitor

Share
  • Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.

Product description
Quotation & delivery
  • End connection
    IEC C13
  • AC Outlets Quantity
    2 Outlets
    Cable Length
    0.3 m(0.98ft)
  • End Type
    C13
    Rated Current
    10 A
  • Type
    Ac Power Cord
  • Application
    Home Appliance
    Female End Type
    IEC
  • IP Level
    IP20
    Male End Type
    C14
  • Material
    Copper, PVC
    Wire Type
    H05VV-F

A Y-type equipment splitter should keep both receivers with the single supply connection. This IEC C14-to-dual-C13 one-to-two lead has a 0.3m reach, H05VV-F copper/PVC construction and a 10A designation.

Define the two-device Y arrangement

Identify the receiving equipment that each C13 end must serve. Compare both female connections with the actual computer, monitor or other equipment inlets.

Keep both device requirements in the same specification. Their combined demand belongs with the common C14 supply path rather than with two assumed independent incoming capacities.

Plan the compact connection route

Measure the route from the actual C14 source position to both receiving inlets. Include the space occupied by all three connector bodies in the compact arrangement.

Retain the 0.3m reach with that layout. The required path should describe the particular PDU, UPS or equipment position where the Y-splitter will be connected.

Match H05VV-F construction and full rating

The cable uses H05VV-F with copper and PVC material. Keep those construction details with the ordered C14 and dual-C13 connection requirement.

Specify the complete operating voltage and selected splitter rating with its 10A designation. Check the full cable path against the actual source and combined receiving-device demand.

A practical two-device inquiry should identify the source, both inlets, compact routes and wire build. These details define the particular Y-type lead needed by the installation and provide one complete physical and electrical specification for the receiving equipment arrangement.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.

Related Products