Series illustrations. Actual configuration is subject to the confirmed drawing.
IEC C14 to C13 Multiway Power Splitter Cord, 0.6m PVC 10A Equipment Extension with Custom Branch Configuration
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
End connectionIEC C14 , IEC C13
-
AC Outlets Quantity4 OutletsCable Length0.6M(1.97ft)
-
End TypeC14, C13Rated Current10 A
-
TypeAc Power Cord, AC power cord
-
ApplicationHome ApplianceFemale End TypeIEC
-
IP LevelIP11Male End TypeIEC
-
MaterialCopper, PVCWire TypeH05VV-F, SVT
-
Itemiec 320 c14 to 4x iec 320 c13 power cablesJacketPVC
-
CableSJT/SVT 16AWG/3C,H05VV-F 1.0mm2CertificateROHS,USA,VDE
-
Length0.6mFactoryOEM.ODM
-
Free samples2-3PCSConductorCopper,CCA,CCS
-
Warranty2 Years
Start a multiway power-cord request with the number of equipment connections that the installation needs. This IEC C14-to-C13 splitter has a 0.6m PVC configuration and a 10A designation, with the final C13 branch arrangement to be agreed for the ordered build.
Define the branch layout first
Identify the C14 supply connection and each equipment inlet that needs a C13 end. Include the required branch count in the order specification so the receiving devices and cable layout can be checked together.
If four C13 ends are required, state that layout explicitly and confirm it against the assembly drawing. A multiway description alone should not replace a clear agreement on the number and position of the equipment connectors.
Measure the route to every device
The specified cable reach is 0.6m. Compare the intended path from the supply point to all receiving inlets, allowing for connector positions and the space needed around the equipment.
The useful route depends on the full branch arrangement rather than the distance to only one device. Provide the equipment positions with the required connector count when requesting a particular splitter build.
Confirm shared load and construction
The 10A designation needs to be matched to the complete assembly and the combined connected demand. Confirm the operating voltage, wire gauge and conductor material for the chosen configuration before using it in the installation.
OEM and ODM requests and two-to-three-piece sample requests are available. Include those construction details with the required branch count and reach, giving the inquiry a specific electrical and physical requirement.
The final selection should identify one supply point, the agreed number of C13 ends and the complete cable rating. That creates a clear basis for matching a multiway lead to the actual equipment arrangement.




Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.