Series illustrations. Actual configuration is subject to the confirmed drawing.
Industrial Spiral PDU SJT SJTOW Power Cord with IEC C19 Female, Copper PVC Selected 18 16 14AWG 6-50 6-15P 5-15P Male-Source and Fuse Request
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
Insulation materialPVCConductor materialCopper
-
Conductor MaterialCopperInsulation MaterialPVC
-
ApplicationIndustrial
-
JacketPVC, PVC power cord/LZSHTypeMedium Voltage, middle Voltage
-
ConductorCopperLength6ft 15ft 20ft or custmized
-
Volt/Current110-220V 16aPower cord Fuse4/10/13/15A
-
Type EndROJ,IEC Connector,Terminals.HousingIEC connectorIECC19 female connector
-
CertificatesYesCable GuageSJT SJTOW 18AWG/16AWG/14AWG
The industrial spiral/PDU lead request includes a C19 female receiving requirement with copper/PVC construction. SJT or SJTOW 18AWG, 16AWG or 14AWG choices should remain attached to one actual source, termination and complete operating build.
Define the actual male source and receiving ends
Agree the requested 6-50, 6-15P or 5-15P source against its intended mating interface. Retain the C19 receiving form with the actual equipment connection.
Confirm any requested ROJ, IEC, terminal or housing end arrangement. Keep the actual termination dimensions and wiring in the complete assembly drawing.
Select wire, jacket and physical reach
Agree SJT or SJTOW and the actual 18AWG, 16AWG or 14AWG requirement. Retain copper construction with the chosen cable.
Specify actual PVC or the requested LZSH jacket specification for that build. Choose 6ft, 15ft or 20ft, or custom reach, with all selected connection bodies included in the route.
Separate fuse choice from the whole rating
Select an actual 4A, 10A, 13A or 15A fuse requirement. Keep that fuse choice distinct from complete 110–220V, 16A operating scope.
Confirm the actual application-voltage class for the ordered assembly. Match the full electrical specification to the wire, source, receiving ends and connected industrial-equipment demand.
A spiral/PDU lead brief should settle actual source, ends, wire, jacket, reach, fuse and complete rating together. Those details define the requested C19 equipment connection around one physical assembly, keeping its selected wiring and application requirements with the operating load at the receiving equipment.




Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.