Series illustrations. Actual configuration is subject to the confirmed drawing.

NG-A 3+2-Core Flexible Copper Mineral-Insulated Fire-Resistant Industrial Emergency Power Cable 0.6/1kV

Share
  • Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.

Product description
Quotation & delivery
  • Rated voltage
    0.6/1 kV
    Insulation material
    Mineral
  • Conductor material
    Copper
  • Conductor Material
    Copper
    Insulation Material
    Mineral
  • Rated Voltage
    0.6/1kV
    Size
    None
  • Type
    Multi-Core Power Cable

This 3+2-core NG-A cable is intended for industrial emergency power. The specified build is flexible and fire resistant, using copper conductors and mineral insulation with a 0.6/1kV rating. A useful selection process connects those product facts with the actual industrial equipment and its emergency circuit requirements.

Give the industrial connection review a complete conductor allocation

Use the electrical design to define each conductor's section and function. Do not treat the 3+2 notation as a neutral or protective-conductor assignment. The drawing should identify the details needed to review the chosen cable configuration.

  • The 3+2 arrangement and required section of every conductor.
  • The equipment connection points served by those conductors.
  • The cable ends and termination arrangement for the selected build.

Set the emergency acceptance criterion before comparing evidence

Identify any required fire-test method, survival period or acceptance conditions in the industrial specification. Review the matching construction evidence for that criterion and its installation conditions. Ordinary fire resistance remains part of the product identity, without being converted into an unstated test class.

Choose the sheath with the route and cable ends

Complete the copper/mineral material description with the agreed sheath. Obtain the bending and handling instructions applicable to that flexible construction. Consider route access, end preparation and connection space when reviewing terminations for the cable being ordered.

Make physical length a separate order requirement

State conductor sections from the circuit design and give physical cut length independently. Retain the approved allocation, selected sheath and cable-end details in the order description. The final industrial emergency schedule should reference the same construction drawing and performance criterion used in the installation review.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.

Related Products