Series illustrations. Actual configuration is subject to the confirmed drawing.
NG-A 3-Core Flexible Copper Mineral-Insulated Fire-Resistant Electric Power Cable for Fire Protection 0.6/1kV
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
Rated voltage0.6/1 kVInsulation materialMineral
-
Conductor materialCopper
-
Conductor MaterialCopperInsulation MaterialMineral
-
Rated Voltage0.6/1kVSizeNone
-
TypeMulti-Core Power Cable
The three-core NG-A power cable is intended for fire-protection applications. Its flexible construction uses copper conductors and mineral insulation, with stated fire resistance and a rated voltage of 0.6/1kV. The circuit design completes each conductor's duty and the final cable build for the installation.
Define the fire-protection duty as a specific project requirement
Identify any required fire-test method, survival period or acceptance conditions in the project specification. Review the selected construction evidence for that criterion and its installation conditions. This gives the ordinary fire-resistant product description an exact project context without assuming a universal qualification.
Give all three conductors an identifiable equipment connection
State the section and electrical function required for each conductor. Show its connection point beside that allocation in the circuit drawing. Keep the three-core designation with those requirements so the cable-end review describes the same electrical configuration as the fire-protection schedule.
Complete the sheath and flexible route before selecting terminations
Add the agreed sheath to the known copper conductor and mineral insulation requirements. Review preparation and compatible cable ends for that actual layer construction. Use applicable bending and handling instructions while considering the intended route, equipment access and the space needed at both connections.
Retain the cable definition with separate physical quantities
Confirm conductor sections for the three-core 50mm2 selection and state physical cut length independently. Include the final sheath, approved allocation and end preparation in the order description. Keep the circuit and construction drawings with any exact fire-protection criterion used in the review, so the cable configuration and quantities can be identified from the final project schedule.






Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.