Series illustrations. Actual configuration is subject to the confirmed drawing.

NG-A Flexible Copper 4-Core Mineral-Insulated Fire-Resistant Electric Cable, 0.6/1kV Construction Fire Safety

Share
  • Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.

Product description
Quotation & delivery
  • Rated voltage
    0.6/1 kV
    Insulation material
    Mineral
  • Conductor material
    Copper
  • Conductor Material
    Copper
    Insulation Material
    Mineral
  • Rated Voltage
    0.6/1kV
    Size
    None
  • Type
    Multi-Core Power Cable

The construction drawing is the starting point for this four-core NG-A power-cable request. Copper conductors and mineral insulation are combined with flexible, fire-resistant construction and a 0.6/1kV voltage rating.

The featured option pairs a 50 mm² size reference with four cores. Keep that configuration with the project requirements as the cable schedule is completed.

Turn the four-core layout into a circuit schedule

Identify the intended duty of each conductor and the required section for that duty. Use the selected 50 mm² reference as part of the specification, then confirm the individual sections and connection arrangement on the final cable drawing.

  • NG-A identifies the cable family required by the project.
  • Four copper cores define the featured conductor arrangement.
  • Mineral insulation retains the stated insulation material.
  • Flexible construction remains a known cable feature.
  • The 0.6/1kV designation provides the stated rated voltage.

Set out the construction-site cable requirement

Provide the physical length needed for the planned route and the cable-end requirements at both connections. Specify the sheath construction for the selected NG-A version, allowing the material build and termination arrangement to be assessed together for the intended installation.

Give the fire-safety review a defined scope

If the construction project requires an exact fire-test criterion, identify that requirement for the ordered cable and its installation conditions. Keep the fire-resistant NG-A build and the project's acceptance requirement together in the cable schedule. A complete four-core schedule, route length and end arrangement give this NG-A cable a practical basis for project quotation.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.

Related Products