Series illustrations. Actual configuration is subject to the confirmed drawing.

VV32 4-Core 50mm2 Copper PVC-Insulated Steel-Wire-Armoured SWA Multi-Core Electric Power Cable 0.6/1kV IEC 60502

Share
  • Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.

Product description
Quotation & delivery
  • Rated voltage
    0.6/1 kV
    Insulation material
    PVC
  • Conductor material
    Copper
  • Conductor Material
    Copper
    Insulation Material
    PVC
  • Rated Voltage
    0.6/1kV
    Size
    None
  • Type
    Multi-Core Power Cable

VV32 combines copper conductors, PVC insulation and steel-wire armour at 0.6/1kV in the four-core 50mm2 configuration, with an IEC 60502 reference. Review the full SWA material requirements and individual conductor arrangement using the circuit design. Complete compatible cable ends and physical quantities against the selected outer build, equipment connections and intended installation route.

Specify the applicable IEC 60502 scope

Identify the applicable part and required supporting scope wherever the project specifies IEC 60502 acceptance. Check the request against documents for the chosen construction. Keep the precise criterion available with the full material and circuit drawings throughout the technical review. The cable identity and requested evidence should be considered together when the proposed build is compared with the project requirements.

Complete the copper conductor and SWA construction drawing

Give every conductor a required section, electrical duty and equipment connection on the circuit drawing. Keep the allocation beside the four-core 50mm2 configuration, with copper conductor material, PVC insulation and steel-wire armour on the full material reference. Agree the final outer sheath and choose compatible ends using the finished build. Review equipment access and preparation space before end allowances and terminations are finalized.

Finish installation and the physical quantity schedule

Obtain installation information applicable to the selected construction and intended route. List physical cut lengths and quantities independently of conductor-area notation, including agreed connection allowances. Complete the schedule with the final sheath, approved allocation and compatible ends. Keep the material drawing, circuit reference and precise acceptance request with the physical quantities for the required electric power cable.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.