Series illustrations. Actual configuration is subject to the confirmed drawing.
YJV32 4-Core 50mm2 Copper XLPE Steel Wire Armoured SWA Multi-Core Power Cable 0.6/1kV
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
Rated voltage0.6/1 kVInsulation materialXLPE
-
Conductor materialCopper
-
Conductor MaterialCopperInsulation MaterialXLPE
-
Rated Voltage0.6/1kVSizeNone
-
TypeMulti-Core Power Cable
YJV32 combines copper conductors, XLPE insulation and steel-wire armour in a four-core power cable rated 0.6/1kV. Its technical section selection is 50mm2. Review the required circuit allocation with the full material drawing and equipment connections, then complete the cable-end arrangement and physical quantities for the selected SWA build.
Build the circuit allocation around individual conductors
Give each conductor a required section, electrical duty and connection point using the circuit design. Keep the individual allocation with the four-core 50mm2 selection during the equipment review. Choose compatible cable ends for the approved arrangement and complete construction. Include the space and access needed for end preparation when the equipment connections and final termination details are agreed.
Describe the complete copper, XLPE and steel-wire build
Retain the three specified material requirements on the full construction drawing and agree the final outer sheath. Obtain preparation and installation information for the resulting cable build. Compare the chosen SWA arrangement with the intended route and connection requirements, using the finished description alongside the conductor drawing. Keep both references available when discussing physical end allowances and the details needed to prepare and connect either end.
Finish the order with quantities and exact requirements
State the required physical cut lengths and number of cuts separately from the 50mm2 conductor-area notation. Include agreed allowances, the final sheath and compatible ends with the approved allocation. Where the project has a particular acceptance criterion, name it precisely and request documents for the selected construction. Complete the purchase schedule using the full circuit, material and applicable installation references for the required power cable.






Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.