Series illustrations. Actual configuration is subject to the confirmed drawing.
NG-A 3-Core Flexible Copper Mineral-Insulated Fireproof Construction Fire-Safety Electric Cable 0.6/1kV
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
Rated voltage0.6/1 kVInsulation materialMineral
-
Conductor materialCopper
-
Conductor MaterialCopperInsulation MaterialMineral
-
Rated Voltage0.6/1kVSizeNone
-
TypeMulti-Core Power Cable
The three-core NG-A electric cable is intended for construction-project fire safety and is rated 0.6/1kV. Its specified build uses copper conductors and mineral insulation, with flexible, fireproof construction. Complete the project configuration through the individual conductor duties, final sheath and connections required by the construction circuit.
What do the three connections require?
Give every conductor a required section, electrical function and equipment connection. Retain that individual allocation beside the three-core identity in the circuit design. Review the proposed terminations against this completed configuration, allowing the equipment requirements to remain clear as cable-end preparation and physical quantities are agreed.
Complete the flexible material reference
Specify the final sheath together with conductor copper and mineral insulation on the approved construction drawing. Compare alternative cables using the complete layer build. Obtain handling and bending information for the selected flexible construction, then assess the route, access at the equipment and available preparation space for both ends.
Identify exact fire acceptance conditions
Keep the ordinary fireproof characteristic alongside the intended construction fire-safety use. If the project requires a particular method, classified result or survival period, state the acceptance conditions precisely. Review evidence applicable to the actual cable construction and installation scope, retaining the exact criterion with the selected material drawing.
Finish sections and physical cut length
Confirm individual conductor sections for the three-core 50mm2 selection and give cable cut length separately. Include the approved allocation, final sheath and agreed cable ends with the final order quantities. Keep the circuit and construction references together so the purchase schedule identifies the required materials, electrical configuration, connection conditions and relevant project criterion for the construction installation.






Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.