Series illustrations. Actual configuration is subject to the confirmed drawing.

NH-YJV 4-Core 50mm2 Copper XLPE-Insulated Fire-Resistant Power Cable 0.6/1kV IEC 60502

Share
  • Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.

Product description
Quotation & delivery
  • Rated voltage
    0.6/1 kV
    Insulation material
    XLPE
  • Conductor material
    Copper
  • Conductor Material
    Copper
    Insulation Material
    XLPE
  • Rated Voltage
    0.6/1kV
    Size
    None
  • Type
    Multi-Core Power Cable

NH-YJV combines copper conductors and XLPE insulation in a fire-resistant power cable rated 0.6/1kV, with a four-core 50mm2 configuration and an IEC 60502 reference. Review the required fire-performance criterion alongside the circuit and full material drawing. Complete compatible cable ends and physical quantities using the selected construction and intended installation route.

Specify the exact fire-performance requirement

Fire resistance forms part of this cable's construction. Where a particular class or method is required, identify the criterion precisely and request matching information for the selected build. Keep the exact request with the material and circuit drawings when the proposed cable and supporting performance scope are reviewed.

Complete the copper and XLPE construction drawing

Retain copper conductor material and XLPE insulation on the full material reference, agreeing the remaining outer construction and final sheath for the chosen build. Obtain preparation information for that complete cable. Use the finished layer description when compatible cable ends and installation details are compared with the intended route and equipment requirements.

Define conductor duties and the IEC 60502 scope

Give every conductor a required section, electrical function and equipment connection on the circuit drawing. Keep the allocation beside the four-core 50mm2 configuration. Identify the applicable IEC 60502 part and supporting scope wherever the project specifies them, retaining the precise request with the selected construction and approved conductor arrangement.

Finalize the physical cable quantities

Choose ends compatible with the complete build and conductor requirements, reviewing equipment access and preparation space. Obtain installation information applicable to the selected construction and route. State physical cut lengths and quantities separately from conductor area, including agreed allowances, the final sheath, approved allocation and compatible ends in the completed purchase schedule.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.