Series illustrations. Actual configuration is subject to the confirmed drawing.
12–24V 2-Pin SAE-to-Ring Harness, 15A Inline Fuse Copper-Core PVC IP20 40cm
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
End connectionSAE connection , DC connectorInsulation materialPVC
-
Conductor materialCopper
-
Conductor MaterialCopper CoreConnector TypeSAE DC
-
Insulation MaterialPVCLength40CM
-
Rated Voltage12V-24V
-
ApplicationAutomobile, Computer, Electronic, Home Appliance, Machines, Motorcycle, PCB, Power, Solar panel battery connection lineIP LevelIP20
-
Jacket MaterialCopperSize40CM
This SAE two-pin quick-disconnect-to-O-ring harness includes a 15A inline fuse with copper cores, PVC insulation and 12–24V/IP20 specifications. The actual selection is red/black lines, two-core and 2P, with a 40cm physical-length reference. Named automobile, motorcycle and solar-panel battery connections provide the application context for the selected full assembly.
Retain the complete cable-layer construction
Copper cores and PVC insulation identify the known conductor and insulating layer. Confirm the role of the separate copper jacket-material reference and define the complete outer construction on the chosen drawing. Agree the exact wire size with the intended connection, retaining the full material description beside the selected end and preparation details.
Match the ring terminals and quick-disconnect polarity
Define the ring dimensions and SAE two-pin mating arrangement for the battery and equipment. Match polarity against the actual connections, keeping the two-core/2P selection with that end drawing. Include the required preparation and installation information for the selected wire and compatible ends when the finished harness is agreed.
Coordinate the inline fuse and physical assembly
The 15A value describes the inline fuse in this named version. Define the required lead current with the selected 12–24V equipment connection and review the whole wire/end/fuse combination. Retain the IP20 installation scope with those electrical requirements. Confirm the 40cm physical lead, chosen red/black arrangement and quantity on the same schedule. Complete the request using the approved outer-layer construction, wire size, ring dimensions and pin/polarity details throughout the harness comparison.


Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.