Series illustrations. Actual configuration is subject to the confirmed drawing.
Black European EU L-Shaped C13 Kettle Equipment Power Lead, 1.8m H05VV-F Three-Core 0.75mm² Copper PVC with Selected Voltage and 10A 16A Scope
-
Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.
-
End connectionIEC C13Conductor materialCopper
-
AC Outlets Quantity1 OutletsCable Length1m, 1.8 m , 3 m, 5m
-
End TypeC13, Angle IEC C13Rated Current10 A, 16 A
-
TypeAc Power Cord
-
ApplicationTelecommunication, HomeFemale End TypeIEC
-
IP LevelIP11Male End TypeCEE
-
MaterialCopper, PVCWire TypeH05VV-F
-
NameEuropean Eu C13 Connector Standard Power Socket Larm Vde cablecableH05VV-F 3C*0.75mm2
-
colorblackcertificatedCE ,VDE,ROHS
-
length1.8mconductorcopper
-
jacketPVCMOQ500 pcs
An L-shaped C13 equipment-lead request pairs the European source with actual black EU 1.8m construction. Keep H05VV-F three-core 0.75mm² copper/PVC wire with the selected kettle, home or telecommunication connection and its complete operating-voltage and current requirement.
Position the L-shaped receiver around the inlet
Compare actual C13 or angled-C13 mating dimensions with the receiving equipment. Agree cable direction and available space around the L-shaped connection.
Retain the source and receiving forms in the same assembly drawing. The selected geometry and wiring should describe one actual equipment-power path and its intended inlet.
Retain the actual wire and requested reach
Keep the three-core H05VV-F 0.75mm² copper/PVC construction with actual 1.8m reach. Agree any requested 1m, 3m or 5m dimension against the equipment positions.
Measure using both connector bodies and the selected cable direction. Retain the black finish with that exact source-to-receiver route and complete physical build.
Define the whole operating requirement
Agree complete operating voltage and 10A or 16A scope for the actual source, wire and C13 receiver. Match the whole electrical specification to the connected equipment and its operating demand.
Attach required protection and appliance conditions to the actual installation. An L-C13 brief should settle source, angled geometry, wiring, exact route and full rating together, retaining the selected three-core construction with its real equipment inlet and operating load.
For a kettle installation, agree the actual receiving-inlet conditions with the appliance requirement. Include source position, L-shaped connector clearance and selected conductor wiring in the same final brief, so the chosen cable route and complete operating specification describe the actual equipment connection being ordered.



Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.