Series illustrations. Actual configuration is subject to the confirmed drawing.

BTLY Flexible Copper Mineral-Insulated Fire-Resistant Construction Power Distribution Cable Rated 0.6/1kV

Share
  • Quotation & delivery: Include your required quantity, destination and timing in the enquiry. Confirm the selected build, lead time, shipping charges and any return terms in the agreed quotation before ordering.

Product description
Quotation & delivery
  • Rated voltage
    0.6/1 kV
    Insulation material
    Mineral
  • Conductor material
    Copper
  • Conductor Material
    Copper
    Insulation Material
    Mineral
  • Rated Voltage
    0.6/1kV
    Size
    None
  • Type
    Multi-Core Power Cable

This BTLY cable is a flexible mineral-insulated copper construction for construction power distribution. Its voltage rating is 0.6/1kV, with fire resistance stated for the product. Agree the complete core layout and sheath before finalizing the physical configuration needed for the project connections.

Which arrangement should the construction cable order identify?

Use the electrical design to establish a definite core layout and the required section and function of every conductor. Record the equipment connections with that allocation. Retain the agreed layout on the drawing used to review terminations and cable-end preparation. The completed schedule should identify the individual conductor requirements as well as the overall configuration selected for the construction circuit.

Coordinate the final material build with the flexible route

Keep copper conductor material and mineral insulation as explicit construction requirements. Add the sheath selected for the actual order and review end compatibility against the resulting drawing. Apply installation information for that flexible build when considering the intended route, equipment access and room at both connections. The material specification and connection review should refer to the cable configuration that will be supplied.

Complete the distribution performance brief and physical quantities

Name any IEC method or particular fire-test acceptance condition required by the construction project. Review the selected build and its evidence for the intended duty and installation. After agreeing the layout, confirm each required conductor section for the selection identified as 50mm2 and give physical cable length as a separate quantity. Include the final sheath, approved allocation and end requirements in the purchase description. Retain the construction drawing, circuit schedule and exact project performance criterion as the common reference for checking the completed order.

Provide the product reference, selected configuration, quantity and destination. Confirm drawings, applicable ratings and acceptance requirements for the requested build. Lead time, shipping arrangements, charges and any return conditions should be reviewed in the agreed quotation before ordering.

Related Products